Dilworth (Leckie to S of Leckie) Sidewalk Extension
This project includes installation of 78m of sidewalk extending South along Dilworth from the existing sidewalk at the South East corner of the Leckie and Dilworth intersection. Design is scheduled for 2026 and construction will be completed in 2027.



