Permit number: RUP2020-0168
Project contact: Clayton Murray
Phone: 250-258-4005
EAST END OF ROAD to WOODHAVEN PL
July 8, 2020 (All day) to September 25, 2020 (All day)
Single Lane Alternating
WESTPOINT CT to WESTPOINT PL
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
RAYMER RD to HUBBARD CT
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
HUBBARD CT to FREDERICK RD
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
BULLOCK RD to CORONADO CR
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
RAYMER RD to FREDERICK RD
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
RAYMER RD to SCHAFER RD
July 8, 2020 (All day) to September 25, 2020 (All day)
Single Lane Alternating
BARTON ST to MARANDA ST
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
HAMMER AVE to HUBBARD RD
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
BARTON ST to EAST END OF ROAD
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
HUBBARD RD to BULLOCK RD
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
FREDERICK RD to BARTON ST
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
WOODHAVEN PL to MARANDA ST
July 8, 2020 (All day) to September 25, 2020 (All day)
Single Lane Alternating
MARANDA CT to HAMMER AVE
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
MARANDA CT to HAMMER AVE
July 8, 2020 (All day) to September 25, 2020 (All day)
Single Lane Alternating
RAYMER RD to MARANDA CT
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
RAYMER RD to MARANDA CT
July 8, 2020 (All day) to September 25, 2020 (All day)
Single Lane Alternating
GORDON DR to WASILOW RD
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
DEHART RD to WESTPOINT CT
July 8, 2020 (All day) to September 25, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
SCHAFER RD to DEHART RD
July 13, 2020 (All day) to September 25, 2020 (All day)
Lane Drop - Multi Lane Road, Continually Moving Work
GORDON DR to WESTPOINT DR
July 13, 2020 (All day) to September 25, 2020 (All day)
Lane Drop - Multi Lane Road, Continually Moving Work
274 Lawrence Ave (Lane) - Equipment on City Lane. Previous permit Stu Evans has approved.
Permit number: RUP2020-0194
Phone: 250-317-5055
LAWRENCE AVE to LANE
June 19, 2020 - 7:00am to October 19, 2020 - 2:00am
Local Traffic Only
All Overhead and Non Excavation Work
Permit number: 14886
Project contact: Darren Langford
Phone: 250-859-0349
PINTO RD to ADAMS RD
August 13, 2020 (All day) to August 21, 2020 (All day)
No Disruption
PINTO RD to ADAMS RD
August 13, 2020 (All day) to August 21, 2020 (All day)
No Disruption
ADAMS RD to HWY 97 N
August 13, 2020 (All day) to August 21, 2020 (All day)
No Disruption
ADAMS RD to HWY 97 N
August 13, 2020 (All day) to August 21, 2020 (All day)
No Disruption
SEXSMITH RD to APPALOOSA RD
August 13, 2020 (All day) to August 21, 2020 (All day)
No Disruption
SEXSMITH RD to APPALOOSA RD
August 13, 2020 (All day) to August 21, 2020 (All day)
No Disruption
Balser Crt 9380 - Install water valve if investigation show incorrect size.
Permit number: RUP2020-0226
Project contact: Clay Spencer
Phone: 250-801-3788
POTTERTON RD to NORTH END OF ROAD
July 31, 2020 - 7:00am to August 30, 2020 - 5:00pm
Single Lane Alternating
Benvoulin Crt 2080 - continue project from last year. Install light base, telus box, curb, sidewalk & repave road.
Permit number: RUP2020-0301
Project contact: Bob MacPherson
SOUTH END OF ROAD to SPRINGFIELD RD
August 6, 2020 - 7:00am to August 28, 2020 - 5:00pm
Single Lane Alternating
SOUTH END OF ROAD to SPRINGFIELD RD
August 6, 2020 - 7:00am to August 28, 2020 - 5:00pm
Single Lane Alternating
SOUTH END OF ROAD to SPRINGFIELD RD
August 6, 2020 - 7:00am to August 28, 2020 - 5:00pm
Single Lane Alternating
Big Steel Box on City Road Shoulder - storing furniture till renovations completed.
Permit number: RUP2020-0338
Project contact: Patricia Fofie
Phone: 236-420-0285
SOUTH END OF ROAD to PURCELL DR
August 5, 2020 (All day) to December 31, 2020 (All day)
No Disruption
Boom Lift on City Road Shoulder
Permit number: 15021
COUNTRY CLUB DR to EAST END OF ROAD
April 6, 2020 (All day) to September 9, 2020 (All day)
No Disruption
Borden Ave 935 - Sea Can on city road shoulder to the north side of Borden. Building a 4-plex
Permit number: RUP2020-0284
Phone: 250-878-0670
ETHEL ST to BOWES ST
August 4, 2020 (All day) to December 31, 2020 (All day)
No Disruption
Boyd Rd 2810 - extend Boyd Rd for 3 lot subdivision and extend water & sanitary sewer mains.
Permit number: RUP2020-0295
Project contact: Pat Adkin
BOYD RD to COMO RD
August 4, 2020 - 7:00am to August 28, 2020 - 6:00pm
Local Traffic Only, No Disruption
Boynton Pl 655 - Part of Permit #14867 - Continue Project. Install Services to new condo site.
Permit number: RUP2020-0073
Project contact: Tristen Taylor
HIGHPOINTE DR to CARAMILLO RD
May 5, 2020 - 7:00am to September 4, 2020 - 6:00pm
Single Lane Alternating
BOYNTON PL to TRADITIONS CR
May 5, 2020 - 7:00am to September 4, 2020 - 6:00pm
Single Lane Alternating
Carion Rd 180 -start date on app was reversed. Should read Aug 10th. Repair asphalt as temp cold patch was used.
Permit number: RUP2020-0328
JIM BAILEY RD to HALDANE RD
August 10, 2020 - 7:00am to August 15, 2020 - 5:00pm
Single Lane Alternating
Cawston Ave @ Richter St 1308 - intermittent closures for deliveries and crane set ups. The same for the back lane.
Permit number: RUP2020-0242
Project contact: Toby
FULLER AVE to CAWSTON AVE
July 5, 2020 (All day) to August 19, 2020 (All day)
Full Road Closure, Local Traffic Only, Detour
RICHTER ST to ETHEL ST
July 4, 2020 - 7:00am to September 4, 2020 - 4:30pm
Continually Moving Work, Emergent Work
City Contract Annual Permit Landscaping Mtce - Meridian/Sidewalk 2020
Permit number: 14942
Project contact: Tim Marshall
FISHER RD to MUNSON RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
MUNSON RD to BEETLESTONE DR
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CLARANCE AVE to FROST RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
FROST RD to STEELE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
PONDS AVE to CLARANCE AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SOUTH END OF ROAD to PONDS AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LAUREL AVE to TRENCH PL
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CLIFTON RD to SPALL RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CERISE DR to CLIFTON RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
PARET RD to THORNELOE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
STEELE RD to PARET RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CASORSO RD to BARNES AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BARNES AVE to LADNER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BOTHE RD to KLO RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LADNER RD to BOTHE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
MISSION SPRINGS CR to CASORSO RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
COOK RD to MISSION SPRINGS CR
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LEXINGTON DR to COOK RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
VANCE AVE to BUCK RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
HARMONY CT to RAYMER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
RAYMER RD to SCHAFER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SCHAFER RD to DEHART RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
DEHART RD to TOZER CT
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
TOZER CT to BALSAM RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BALSAM RD to HAZELL RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
HAZELL RD to SAN MICHELLE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
YOUNG RD to PARET PL
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SAN MICHELLE RD to YOUNG RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
WELKE RD to OLD MEADOWS RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
OLD MEADOWS RD to LEQUIME RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LEQUIME RD to LEXINGTON DR
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
RISSO RD to PIONEER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
PIONEER RD to RAMPONE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
KLO RD to RAYMER AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
KLO RD to FISHER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BEETLESTONE DR to BYRNS RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CAMERON AVE to GUISACHAN RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BYRNS RD to COOPER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
GUISACHAN RD to GLENWOOD AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
COOPER RD to MAYER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
GLENWOOD AVE to SPRINGFIELD RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
HOY ST to WILKINSON ST
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
WILKINSON ST to INKAR RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
INKAR RD to BURTCH RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BURTCH RD to DAYTON ST
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
DAYTON ST to KIRSCHNER RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
KIRSCHNER RD to SPALL RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BARON RD to HARVEY AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
PACIFIC AVE to SUTHERLAND AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SUTHERLAND AVE to BORDEN AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BORDEN AVE to LAURIER AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LAURIER AVE to HARVEY AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
HARVEY AVE to LEON AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LEON AVE to LAWRENCE AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BRANT AVE to LAUREL AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
WEDDELL PL to BRANT AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CORONATION AVE to HIGH RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
HIGHLAND DR N to MOUNTAIN AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
YATES RD to WATSON RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
WATSON RD to BALLOU RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BALLOU RD to DALLAS RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
GALIANO RD to BEGBIE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CLEMENT AVE to WEDDELL PL
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
TRONSON DR to SUMMIT DR
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BENVOULIN RD to BARON RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
MAYER RD to SPRINGFIELD RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
MCCLURE RD to HARMONY CT
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BUCK RD to MCCLURE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BERNARD AVE to LAWSON AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CHAMBERLAIN RD to KLO RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
RAMPONE RD to CHAMBERLAIN RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
DILWORTH CR to HIGHLAND DR N
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SOUTH PERIMETER WAY to LAKEPOINTE DR
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LAKEPOINTE DR to MAIN ST
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CROSS RD to UNION RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SCENIC RD to SNOWSELL ST N
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SCENIC RD to SNOWSELL ST N
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
GLENMORE RD to SCENIC RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CASORSO RD to RISSO RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
HIGH RD to CLEMENT AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
FULLER AVE to WILSON AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
STOCKWELL AVE to FULLER AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LAWRENCE AVE to BERNARD AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
RAYMER AVE to CAMERON AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
MOUNTAIN AVE to TRONSON DR
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
PARET PL to WELKE RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
DALLAS RD to CROSS RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
MARTIN AVE to STOCKWELL AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
LAWSON AVE to MARTIN AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BERNARD AVE to DILWORTH CR
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
GLENMEADOWS RD to YATES RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
GLENMORE DR to GLENMEADOWS RD
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
THORNELOE RD to VANCE AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CAWSTON AVE to CORONATION AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
WILSON AVE to CAWSTON AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
BROOKSIDE AVE to PACIFIC AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
SPRINGFIELD RD to BROOKSIDE AVE
March 2, 2020 - 9:00am to October 31, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
Clement Ave 726 - landscaping boulevard bet sidewalk and curb for new building. Loading and unloading materials for landscaping.
Permit number: RUP2020-0244
Project contact: John Price
RICHTER ST to ETHEL ST
July 14, 2020 - 9:00am to August 15, 2020 - 3:30pm
No Disruption
Dickson Ave 1640/1700 - Unloading Construction Material Periodic Intermittent 20 min closures
Permit number: RUP2020-0308
Project contact: Ryan Seddon
DAYTON ST to KIRSCHNER RD
January 1, 2020 - 6:00am to December 31, 2020 - 4:30pm
Local Traffic Only, Detour, Continually Moving Work, Emergent Work, Business Open
Ellis St 1055-63 - closing sidewalk for construction of a 3 story BC Housing Supportive Housing Project
Permit number: RUP2020-0285
Phone: 1-250-318-2137
INDUSTRIAL AVE to MANHATTAN DR
July 26, 2020 (All day) to September 25, 2020 (All day)
No Disruption
Ellis St 1232 / Cannery Lane / Water St - decommission storm service, replace and remove curb, pave to centerline on Ellis, new decorative sidewalk on Ellis and Water St, pave Cannery Lane
Permit number: RUP2020-0299
Project contact: Felix Menu
Phone: 778-212-3004
SUNSET DR to CLEMENT AVE
July 31, 2020 - 9:00am to August 28, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CLEMENT AVE to GASTON AVE
July 31, 2020 - 9:00am to August 28, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
CANNERY LANE to CLEMENT AVE
July 31, 2020 - 9:00am to August 28, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work
Ellis St 1475 - Manlift to access higher sections of the building face to install exterior panels. Pedestrians detoured to sidewalk on other side of street and use of parking spaces infront of building.
Permit number: RUP2020-0210
Project contact: Justin Yee
Phone: 250-826-6004
BERNARD AVE to QUEENSWAY
July 8, 2020 - 9:00am to August 30, 2020 - 4:00pm
No Disruption
Enterprise Way 1915 - Complete Project. Sidewalk work
Permit number: RUP2020-0309
Project contact: Jon Bahry
SPALL RD to HARDY ST
July 25, 2020 - 9:00am to October 2, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work, Business Open
ENTERPRISE WAY to CLEMENT AVE
July 25, 2020 - 9:00am to October 2, 2020 - 3:30pm
Lane Drop - Multi Lane Road, Continually Moving Work, Business Open
Ethel Street Corridor Project - continued
Permit number: RUP2020-0201
Project contact: Rob Reitman
Phone: 250-862-6720
GLENWOOD AVE to CADDER AVE
June 26, 2020 (All day) to October 23, 2020 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Excavation, civil utility connections, backfill, sidewalk removal and new boulevard construction.
Permit number: RUP2020-0190
Project contact: John Downs
Phone: ext 205
LEATHEAD RD to HARTMAN RD
June 18, 2020 - 7:00am to October 1, 2020 - 5:00pm
Continually Moving Work
LEATHEAD RD to DODD RD
June 18, 2020 - 7:00am to October 1, 2020 - 5:00pm
Continually Moving Work
Grenfell Ave 832 - bin on City road shoulder
Permit number: RUP2020-0274
Project contact: Geoff Ho
ETHEL ST to ABERDEEN ST
July 21, 2020 (All day) to August 21, 2020 (All day)
No Disruption
ETHEL ST to ABERDEEN ST
July 21, 2020 (All day) to August 21, 2020 (All day)
No Disruption
ETHEL ST to ABERDEEN ST
July 21, 2020 (All day) to August 21, 2020 (All day)
No Disruption
Joe Rich Rd 2350&1920 Swainson Rd - Install watermain to BMID UV. Laurens Campbell has approved traffic management plan
Permit number: RUP2020-0217
Project contact: Jason Gedig
Phone: 778-488-8434
BEGLEY RD to HWY 33 E
June 29, 2020 - 7:00am to November 15, 2020 - 5:00pm
No Disruption
MCKENZIE RD to TREETOP RD
June 29, 2020 - 7:00am to November 15, 2020 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Leon Ave 815 - Install offsite services, patching asphalt
Permit number: RUP2020-0329
Project contact: Troy
Phone: 250-469-0862
RICHTER ST to ETHEL ST
August 10, 2020 - 7:00am to October 10, 2020 - 6:00pm
Lane Drop - Multi Lane Road, Continually Moving Work
Leon Ave 815 Utility Trailer on City Road Shoulder
Permit number: RUP2020-0224
Project contact: Sheldon/ Mike Ozanne 604 866 3537
Phone: 778-738-1692
RICHTER ST to ETHEL ST
June 30, 2020 (All day) to September 30, 2020 (All day)
No Disruption
Line Painting and other misc tasks.
Permit number: 14283
Project contact: Trevor Hunchak
CLIFTON RD to SPALL RD
June 9, 2020 - 8:00am to December 9, 2020 - 3:30pm
Continually Moving Work
McCurdy Rd 130 - sidewalk and curb replacement plus sewer
Permit number: RUP2020-0225
Project contact: Jim
Phone: 250-878-9177
ALDON RD to RUTLAND RD N
August 7, 2020 - 9:00am to August 31, 2020 - 3:30pm
Continually Moving Work
Mission Ridge Rd 1150 - landscaping materials on City road. SE bound at end of cul-de-sac opposite #1186
Permit number: RUP2020-0331
Project contact: Steve Croxford
Phone: Steve Croxford
WEST END OF ROAD to MISSION RIDGE DR
August 8, 2020 (All day) to August 17, 2020 (All day)
No Disruption
Nickel Rd 240-260 - road widening. Install storm, water, sani and sidewalk.
Permit number: RUP2020-0173
Phone: 250-862-0893
HWY 33 W to HOUGHTON RD
June 15, 2020 - 7:00am to August 18, 2020 - 5:00pm
No Disruption
North to south across Sexsmith Rd. All previous work completed on previous permit. No backdating required.
Permit number: RUP2020-0303
Project contact: Randy Frasch
Phone: 250-212-0010
PINTO RD to ADAMS RD
August 6, 2020 - 11:00pm to August 21, 2020 - 6:00am
Lane Drop - Multi Lane Road, Continually Moving Work
Richter St (bet Clement & Vaughan) - trucks off loading materials.
Permit number: RUP2020-0332
Project contact: Neil Arnold
Phone: 250-258-8766
CLEMENT AVE to VAUGHAN AVE
August 10, 2020 - 9:00am to September 18, 2020 - 1:30pm
Continually Moving Work, No Disruption
CLEMENT AVE to VAUGHAN AVE
August 10, 2020 (All day) to September 18, 2020 (All day)
Richter St 1229 - N/B on Richter bet Clement and Coronation. Sidewalk only.
Permit number: RUP2020-0269
Project contact: Justin Lawrence
CORONATION AVE to CLEMENT AVE
May 1, 2020 - 7:00am to November 25, 2020 - 6:00pm
Continually Moving Work, No Disruption
CORONATION AVE to CLEMENT AVE
May 1, 2020 - 7:00am to November 25, 2020 - 6:00pm
Continually Moving Work, No Disruption
Richter St 2529 - Watermain service install and decommission on Morrison Ave.
Permit number: RUP2020-0125
Project contact: Cam Snider
Phone: 780-919-6850
PATTERSON AVE to MORRISON AVE
June 1, 2020 - 7:00am to August 21, 2020 - 7:00pm
Full Road Closure, Local Traffic Only, Detour
Richter St Bridge over Mill creek bet Elliott & Burne - Resurface bridge deck.
Permit number: RUP2020-0232
Project contact: Ben Backman
LEVITT LANE to ELLIOT AVE
July 6, 2020 - 9:00am to August 28, 2020 - 3:30pm
Continually Moving Work
Rosemead Ave 210 / Ellis St - Scissor lift on City road shoulder and sidewalk. Pedestrians rereoutd to sidewal on other side of street. Cones to be placed around work zone and scissor list for safety precautions.
Permit number: RUP2020-0304
ELLIS ST to CHAPMAN PL
July 30, 2020 - 8:00am to August 20, 2020 - 4:00pm
Business Open, No Disruption
Rowcliffe Ave 625 - application end date is incorrect. Should read 2020. Sea Can on City road shoulder. REplacing windows.
Permit number: RUP2020-0311
MARSHALL ST to RICHTER ST
August 5, 2020 (All day) to August 20, 2020 (All day)
No Disruption
Rowcliffe Park & Chapman Pl - install new curb, gutter, sidewalk & Park Improvements.
Permit number: RUP2020-0099
Project contact: Kim Johnson
BUCKLAND AVE to ROSEMEAD AVE
May 25, 2020 - 7:00am to August 21, 2020 - 3:30pm
Single Lane Alternating
ROWCLIFFE AVE to DEHART AVE
May 25, 2020 - 7:00am to August 21, 2020 - 3:30pm
Single Lane Alternating
MARSHALL ST to RICHTER ST
May 25, 2020 - 7:00am to August 21, 2020 - 3:30pm
Single Lane Alternating
Sidewalk & Curb Install
Permit number: 13797
Project contact: Randy White
CLEMENT AVE to GASTON AVE
January 1, 2020 (All day) to December 31, 2020 (All day)
Continually Moving Work
SUNSET DR to CLEMENT AVE
January 1, 2020 (All day) to December 31, 2020 (All day)
Continually Moving Work
WATER ST to GUY ST
January 1, 2020 (All day) to December 31, 2020 (All day)
Continually Moving Work
Springfield Rd 1920 / Spall - landscaper laying turf on boulevard at Springfield & Spall
Permit number: RUP2020-0317
Project contact: Vic Worman
SOUTH END OF ROAD to SPRINGFIELD RD
August 6, 2020 - 7:00am to August 19, 2020 - 5:00pm
No Disruption
SPALL RD to BREDIN RD
August 6, 2020 - 7:00am to August 19, 2020 - 5:00pm
No Disruption
Stockwell Dr - continue project. Big Steel Box on City road shoulder.
Permit number: RUP2020-0294
Project contact: David Gervais
Phone: 250-864-7515
RICHTER ST to ETHEL ST
July 26, 2020 (All day) to August 22, 2020 (All day)
No Disruption
Tanager Dr 345 E/B - stock pile sand for pool install. To be distributed same done. Area to be coned off and marked. No traffic interruptions.
Permit number: RUP2020-0273
Project contact: Joel Heard
Phone: 250-215-2343
STELLAR CT to RAVEN DR
July 20, 2020 - 8:00am to August 15, 2020 - 5:00pm
No Disruption
Tree Removal for 2020 on various City Streets
Permit number: RUP2020-0020
Project contact: Tony Wilkinson
Phone: 250-862-0734
UPLANDS DR to STELLAR DR
June 12, 2020 - 8:00am to December 31, 2020 - 4:00pm
No Disruption