Road report

Road information is based on issued road usage permits. All public and private contractors are required to obtain a road usage permit for work affecting traffic flow. Click on a coloured line on the map for details about traffic impacts. 

Subscribe to road report e-updates  

Permit number: RUP2022-0025
Project contact: Kevin Major
BARNES AVE to LADNER RD
December 9, 2022 - 9:00am to December 16, 2022 - 3:30pm
Lane Drop - Multi Lane Road
BOTHE RD to KLO RD
December 9, 2022 - 9:00am to December 16, 2022 - 3:30pm
Lane Drop - Multi Lane Road
LADNER RD to BOTHE RD
December 9, 2022 - 9:00am to December 16, 2022 - 3:30pm
Lane Drop - Multi Lane Road
MISSION SPRINGS CR to CASORSO RD
December 9, 2022 - 9:00am to December 16, 2022 - 3:30pm
Lane Drop - Multi Lane Road
COOK RD to MISSION SPRINGS CR
December 9, 2022 - 9:00am to December 16, 2022 - 3:30pm
Lane Drop - Multi Lane Road
1633 Ellis St - intermittent closures of portion of alley (north of 1633 Ellis St) for loading/unloading, material removal & deliveries.
Permit number: RUP2022-0508
Project contact: Ryan Seddon
Phone: 250-258-8457
ELLIS ST to BERTRAM ST
July 25, 2022 (All day) to December 31, 2022 (All day)
No Disruption
647 Clement Ave - use front street parking and sidewalk for site office, garbage disposal, storage trailers and loading/unloading trucks. Will fence in for safety. Hoarded area approx. 54 m X 4.5 m or 243 m2. Sidewalk closure signs to be posted and de
Permit number: RUP2022-0543
Project contact: Mike Keizer
Phone: 403-612-4818
ST PAUL ST to RICHTER ST
September 1, 2022 (All day) to December 31, 2022 (All day)
No Disruption
Ambrosi Rd 1820 - deliveries of precast concrete panel wall .Will need to stop traffic to back trailers onto the site.
Permit number: RUP2022-0881
Phone: Shane
AMBROSI RD to BARLEE RD
December 12, 2022 - 7:00am to December 18, 2022 - 3:00pm
Continually Moving Work
Appaloosa Rd (bet Arab & Academy Way) E/W and Palomino Lane- install storm, sanitary, water upgrades. Curb, gutter and asphalt. Road closure signs posted already. Detour in place. TMP in place and Emergency services to be notified.
Permit number: RUP2022-0348
Project contact: Scott Hodgkins
Phone: 250-862-0893
ARAB CT to ACADEMY WAY
May 23, 2022 - 7:00am to December 31, 2022 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
ARAB RD to ARAB CT
May 23, 2022 - 7:00am to December 31, 2022 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Benvoulin Rd 2175 - install Telus S/B westbound lane.
Permit number: RUP2022-0841
Project contact: Dan Giesz
Phone: 250-863-7424
COOPER RD to MAYER RD
November 21, 2022 - 9:00am to December 12, 2022 - 3:00pm
Lane Drop - Multi Lane Road
Bernard Ave 560-592 - demolition of building and erect 34 story & 16 story concrete high rises. Retail, parkade podium & residential. Sidewalk closure signs to be posted and to provide detour route for pedestrians.
Permit number: RUP2021-0054
Project contact: Raquel Dusseault
BERNARD AVE to DOYLE AVE
September 28, 2022 - 6:00am to December 31, 2022 - 2:00pm
Single Lane Alternating
ST PAUL ST to BERTRAM ST
September 28, 2022 - 6:00am to December 31, 2022 - 2:00pm
Single Lane Alternating
BERNARD AVE to DOYLE AVE
September 28, 2022 - 6:00am to December 31, 2022 - 2:00pm
Single Lane Alternating
BERNARD AVE to DOYLE AVE
December 20, 2020 - 6:00am to December 23, 2022 - 6:00pm
Single Lane Alternating
BERNARD AVE to DOYLE AVE
December 7, 2020 - 6:00am to December 19, 2022 - 6:00pm
Single Lane Alternating
Black Mountain Dr 1150 N/B & S/- Access is required from the sidewalk with genie to gain access to the front of two buildings for framers, roofer and siding trades We are unable to use a ladder or scaffolding due to a large retaining wall and steep slo
Permit number: RUP2022-0065
Project contact: Munny Panesar
LUND RD to STOCKLEY ST
February 8, 2022 (All day) to December 31, 2022 (All day)
LUND RD to STOCKLEY ST
February 8, 2022 - 9:00am to December 31, 2022 - 3:00pm
No Disruption
Burtch/Sutherland/Parkinson Way/Enterprise Way & Crt/Hardy - sanitary manhole inspections. Short duration work at each manhole. Work being done for City of Kelowna
Permit number: RUP2022-0882
Project contact: Lynn MacDonald 604-561-4314
Phone: Marley Futerko
CAPRI ST to PACIFIC CT
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
SPRINGFIELD RD to DICKSON AVE
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
SPALL RD to EAST END OF ROAD
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
SUTHERLAND AVE to HARVEY AVE
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
GORDON DR to CAPRI ST
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
BARLEE RD to ENTERPRISE WAY
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
ENTERPRISE WAY to NORTH END OF ROAD
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
CHANDLER ST to BURTCH RD
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
PACIFIC CT to LINDAHL ST
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
DICKSON AVE to SUTHERLAND AVE
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
WEST END OF ROAD to UFTON CT
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
UFTON CT to ENTERPRISE CT
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
SPALL RD to HARDY ST
December 13, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
Cara Glen Court 1450 - erect crane. Will intrude with City sidewalk. Sidewalk closure signs to be placed and pedestrians given a detour route.
Permit number: RUP2022-0037
Project contact: Justin Law
SOUTH END OF ROAD to CARA GLEN WAY
June 16, 2022 (All day) to December 31, 2022 (All day)
No Disruption
Casorso Rd 3715 for 3642 Mission Springs Dr - create a drive isle entrance across sidewalk and create site line for road access to job site on Mission Springs Dr. Contractor has rented said property on 3715 Casorso for $75,000 from the City. Only access
Permit number: RUP2021-0240
Project contact: Myk Detmers
Phone: 250-862-0207
MISSION SPRINGS DR to BARRERA RD
January 1, 2022 (All day) to December 31, 2022 (All day)
Lane Drop - Multi Lane Road
Cawston Ave 604 - occupying sidewalk and boulevard for construction use and tool/equipment storage. Sidewalk closure only. Closure signs to be posted. Pedestrians to be rerouted to sidewalk on other side of street.
Permit number: RUP2022-0083
Project contact: Payton Gosselin
Phone: 778-581-9888
ST. PAUL ST to LANE
August 1, 2022 (All day) to December 31, 2022 (All day)
Local Traffic Only, No Through Traffic, Detour
ST. PAUL ST to LANE
February 21, 2022 - 9:00am to December 31, 2022 - 3:00pm
No Disruption
BERTRAM ST to RICHTER ST
August 1, 2022 (All day) to December 31, 2022 (All day)
Local Traffic Only, No Through Traffic, Detour
BERTRAM ST to RICHTER ST
February 21, 2022 - 9:00am to December 31, 2022 - 3:00pm
No Disruption
Cawston Ave 660 - construction of condos. Water, sewer, storm, and asphalt installs and paved.
Permit number: RUP2021-0179
Project contact: Paul Pasutto
ST. PAUL ST to LANE
March 19, 2021 - 7:00am to December 10, 2022 - 3:30pm
Local Traffic Only, No Through Traffic, Detour
BERTRAM ST to RICHTER ST
March 19, 2021 - 7:00am to December 10, 2022 - 3:30pm
Local Traffic Only, No Through Traffic, Detour
Cedar Ave 417 - boulevard will be used to set up Tower Crane and used to drop off materials. This is a child permit from previous permit 862. It was placed on hold due to flooding caused late deliver of crane. Fees will be waived for this permit for or
Permit number: RUP2022-0001
Project contact: Amanda Gurr
ABBOTT ST to PANDOSY ST
January 4, 2022 (All day) to December 31, 2022 (All day)
No Disruption
ABBOTT ST to PANDOSY ST
January 4, 2022 (All day) to December 11, 2022 (All day)
No Disruption
Continue project - Leon Ave 278 - safety issue as trucks will be coming in and out of site, concrete pours etc. sidewalk closure requested. Only during the day. Drawing attached.
Permit number: RUP2022-0756
ABBOTT ST to WATER ST
October 7, 2022 (All day) to December 23, 2022 (All day)
No Disruption
Coronation Ave 1036 - install site services for foundations
Permit number: RUP2022-0862
Project contact: Felix Menu
Phone: 250-765-0330
GRAHAM ST to GORDON DR
November 25, 2022 - 7:00am to December 31, 2022 - 3:00pm
No Disruption
Devonshire Ave 1274 & Belaire Ave - install water, sewer & storm. Removing sidewalk on Devonshire Ave and Belair Ave to allow all site work to be completed. Traffic is not affected. Sidewalks are available on both side of the project for pedestrian use
Permit number: RUP2022-0484
Project contact: Marlon Schaper-Kotter
Phone: 250-718-1609
PRIDHAM AVE to BELAIRE AVE
July 1, 2022 (All day) to December 31, 2022 (All day)
No Disruption
DEVONSHIRE AVE to CHANDLER ST
July 1, 2022 (All day) to December 31, 2022 (All day)
No Disruption
Devonshire Ave 1274 - occupy site trailer across the street from 12 74 Devonshire Ave on the sidewalk easement for a period of approximately 8 months. This is for placement of a temporary site trailer.
Permit number: RUP2022-0314
Project contact: Marlon Kotter
Phone: 250-300-5093
PRIDHAM AVE to BELAIRE AVE
May 10, 2022 (All day) to December 31, 2022 (All day)
No Disruption
PRIDHAM AVE to BELAIRE AVE
December 8, 2022 -
6:00am to 6:00pm
Local Traffic Only
Dickson Ave 1640/1700 - Unloading Construction Material Periodic Intermittent 20 min closures
Permit number: RUP2020-0308
Project contact: Ryan Seddon
DAYTON ST to KIRSCHNER RD
January 1, 2020 - 6:00am to December 31, 2022 - 5:30pm
No Through Traffic, Detour, Emergent Work, Business Open
Enterprise/Leathead/Lester - complete work as part of the Rails & Trails Project
Permit number: RUP2022-0865
SYLVANIA CR to LEATHEAD RD
November 26, 2022 - 7:00am to December 9, 2022 - 5:00pm
Lane Drop - Multi Lane Road
HOUGHTON RD to SYLVANIA CR
November 26, 2022 - 7:00am to December 9, 2022 - 5:00pm
Lane Drop - Multi Lane Road
Ethel St 2493 - change pole and install new anchor
Permit number: RUP2022-0886
Project contact: Glen Morrison
MORRISON AVE to FRANCIS AVE
December 8, 2022 -
9:00am to 3:00pm
Single Lane Alternating
Excavation of dirt from property, Laneway northside of House will be blocked off periodically for use while working. Residents must be notified.
Permit number: RUP2022-0852
Project contact: Joe Cardoso
Phone: 850-864-5673
SUTHERLAND AVE to BORDEN AVE
November 21, 2022 - 8:00am to December 21, 2022 - 4:00pm
Local Traffic Only, No Through Traffic
Fisher Rd 1925 - unstall new pole and anchor
Permit number: RUP2022-0885
Project contact: Glen Morrison
BENVOULIN RD to BOYD RD
December 9, 2022 -
9:00am to 3:00pm
Single Lane Alternating
Fortis Weekly Service Installs - Dec 5 - Dec 9, 2022
Permit number: RUP2022-0883
Project contact: Thomas Abenante
Phone: 250-868-4518
LOCHNESS ST to NAIRN AVE
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
LANFRANCO RD to CEDAR AVE
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
SOUTH RIDGE DR to DRUMMOND CT
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
LONE PINE CT to EAST END OF ROAD
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
SOUTH END OF ROAD to TOWER RANCH DR
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
LADD CT to BULL CR
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
GREY OWL CT to HILLTOWN DR
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
VINT RD to ACADIA ST
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
JUROME RD to ROBSON RD E
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
HILLTOWN DR to EAST END OF ROAD
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
HIRAM WALKER CT to JIM BAILEY CR
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
MCCURDY RD E to TOWER RANCH DR
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
SOUTH END OF ROAD to MCKINLEY BEACH DR
December 5, 2022 - 7:00am to December 9, 2022 - 5:00pm
No Disruption
Gordon Dr 2880 - pole access for fibre drop. Pull conduit. No excavation required.
Permit number: RUP2022-0875
Project contact: Manveer Dhaliwal
KLO RD to RAYMER AVE
December 13, 2022 - 9:00am to December 14, 2022 - 4:00pm
Lane Drop - Multi Lane Road
Gordon Dr @ 1201 Cameron - removal and replacement of fence along Gordon. Sidewalk interruptions at times but mostly working off private property. Sidewalk closure signs to be posted and crosswalks at both Raymer & Cameron for pedestrians to walk.
Permit number: RUP2022-0844
Project contact: Owen Barski
RAYMER AVE to CAMERON AVE
November 22, 2022 (All day) to December 31, 2022 (All day)
RAYMER AVE to CAMERON AVE
November 22, 2022 - 7:00am to December 31, 2022 - 4:00pm
No Disruption
KLO Rd 710 - (back lane) closure for material laydown
Permit number: RUP2022-0825
Project contact: Jessica Fauque
RICHTER ST to CONLIN CT
December 5, 2022 - 9:00am to December 12, 2022 - 3:00pm
Lane Drop - Multi Lane Road
KLO Rd 710-720 - install Fortis, Telus & Shaw conduit for new build. Trenching across Richter St at KLO. Tie-ins to Fortis infrastructure on NW corner of KLO & Richter St. Also in intersection of KLO & Richter
Permit number: RUP2022-0760
Project contact: John Milligan
RICHTER ST to CONLIN CT
October 18, 2022 - 7:00am to December 23, 2022 - 5:00pm
Lane Drop - Multi Lane Road
Lakeshore Rd 3101 on KLO Rd - 4th floor suspended slab concrete pour. In order to reach the work area with a concrete pump it must be staged on KLO. There will be a concrete pump and concrete trucks in the work area shown in the traffic control plan. Once
Permit number: RUP2022-0884
Project contact: Michael Symonds
Phone: 250-487-8125
CEDAR AVE to TUTT ST
December 13, 2022 -
9:00am to 3:30pm
Lane Drop - Multi Lane Road
CEDAR AVE to TUTT ST
December 14, 2022 - 9:00am to December 15, 2022 - 3:30pm
Lane Drop - Multi Lane Road
Lakeshore Rd 3795 on Gordon Dr - Shaw box installed delayed by engineers. Engineers to revise comics.
Permit number: RUP2022-0888
Project contact: Rob Desjardins
COOK RD to BARRERA RD
December 6, 2022 (All day) to December 16, 2022 (All day)
Lane Drop - Multi Lane Road, No Disruption
COOK RD to MISSION SPRINGS CR
December 6, 2022 (All day) to December 16, 2022 (All day)
Lane Drop - Multi Lane Road, No Disruption
Lawrence Ave (400 block) The Ella Bldg - replacement of residential glass at the Ella Bldg. The old glass will be moved by piece and by hand and placed in one of 2 dumpsters which will be stored against the curb. Parking bags to be purchased thru Kelown
Permit number: RUP2022-0701
Project contact: Kanina Wright
Phone: 250-448-8810
PANDOSY ST to ELLIS ST
September 23, 2022 (All day) to December 16, 2022 (All day)
No Disruption
Lawson Ave 970/Graham Ave (Lanes) - install new sanitary sewer ad watermain to replace the existing asbestos cement (AC) pipes in the Lawson Ave area of Kelowna bet Ethel St and Gordon Dr. Project of City of Kelowna Ryan Jennejohn
Permit number: RUP2022-0577
Project contact: Chris Laramee
Phone: 250-869-6826
LAWSON AVE to GRAHAM ST
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
GRAHAM ST to GORDON DR
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
ETHEL ST to GRAHAM ST
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
LANE to MARTIN AVE
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
GRAHAM ST to GORDON DR
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
LAWSON AVE to LANE
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
DEAD END to LAWSON AVE
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
BERNARD AVE to LAWSON AVE
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
ETHEL ST to GRAHAM ST
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
MARTIN AVE to STOCKWELL AVE
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
GRAHAM ST to GORDON DR
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
LAWSON AVE to MARTIN AVE
August 22, 2022 - 7:00am to December 16, 2022 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Mills Rd 320 - Rock hammering to i mprove sight lines along Stockley St. This will involve hauling approx 3300m3 of hammered rock away from Stockley. Stu Evans has approved.
Permit number: RUP2022-0821
Project contact: Felix Menue
Phone: 250-765-0330
BLACK MOUNTAIN DR to SOUTH END OF ROAD
November 14, 2022 - 7:00am to December 9, 2022 - 3:00pm
Lane Drop - Multi Lane Road, Continually Moving Work
Moss Crt - Set up trailer and laydown yard on Moss Crt adjacent to site.
Permit number: RUP2022-0409
Project contact: Andreas Hayer
SOUTH END OF ROAD to EVERGREEN CT
June 7, 2022 (All day) to December 31, 2022 (All day)
No Disruption
Osprey Ave 540 & Pandosy St 2695 - Install water main
Permit number: RUP2022-0768
Project contact: Rob Reitman
Phone: 250-862-6720
PANDOSY ST to MCKAY AVE
October 26, 2022 - 7:00am to December 9, 2022 - 5:00pm
Full Road Closure, No Through Traffic, Detour
PANDOSY ST to MCKAY AVE
October 26, 2022 - 7:00am to December 9, 2022 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Samurai Crt and Nishi Crt - Rebuilding the wall on the upper side of Samurai Crt
Permit number: RUP2022-0514
Project contact: Christina
WEST END OF ROAD to LOSETH DR
July 18, 2022 - 7:00am to December 31, 2022 - 5:00pm
Full Road Closure, Local Traffic Only
WEST END OF ROAD to LOSETH DR
July 18, 2022 - 7:00am to December 31, 2022 - 5:00pm
Full Road Closure, Local Traffic Only
Seasonal Permit - varies City streets throughout the year that require no digging. All overhead and maintenance work or pole replacement. Does not include new pole placements.
Permit number: RUP2022-0003
Project contact: Dustin Bates
Phone: 250-717-0828
WALKER RD to BARKLEY RD
November 22, 2022 - 8:30am to December 9, 2022 - 4:30pm
No Disruption
SOUTH END OF ROAD to WALKER RD
November 22, 2022 - 8:30am to December 9, 2022 - 4:30pm
No Disruption
ELDORADO RD to LAKELAND RD
November 22, 2022 - 8:30am to December 9, 2022 - 4:30pm
No Disruption
LAKELAND RD to BARKLEY RD
November 22, 2022 - 8:30am to December 9, 2022 - 4:30pm
No Disruption
BARKLEY RD to NORTH END OF ROAD
November 22, 2022 - 8:30am to December 9, 2022 - 4:30pm
No Disruption
KIRSCHNER RD to SPALL RD
March 13, 2022 - 8:00am to December 31, 2022 - 3:00pm
No Disruption
Springfield Rd 1994 (lane that runs bet Kent & Ambrosi) - install Fortis conduit.
Permit number: RUP2022-0890
Project contact: John Milligan
Phone: 778-753-3800
EVERGREEN CT to EAST END OF ROAD
December 10, 2022 - 7:00am to December 14, 2022 - 7:00am
No Disruption
Springfield RD @ Ambrosi Rd 1946 - construction fence on City sidewalk. Less than a foot onto the sidewalk and 1.2 m will be maintained at all times. Trip feet will be installed onthe bottom of the fence today.
Permit number: RUP2022-0328
Project contact: Andreas Hayer
Phone: 250-808-7436
AMBROSI RD to BARLEE RD
May 7, 2022 (All day) to December 31, 2022 (All day)
No Disruption
St Paul St 1193 - Construction of commercial buildings (property line to property line). Put up fencing to curb. Blocking sidewalk on St Paul side only. Pedestrians rerouted to sidewalk on other side of street. Let down will still remain open to cross
Permit number: RUP2022-0134
Project contact: Roger LeBlanc
CLEMENT AVE to GASTON AVE
March 8, 2022 (All day) to January 22, 2023 (All day)
No Disruption
Summer Wood Dr 133 - big steel container on City road shoulder to unload furniture.
Permit number: RUP2022-0887
Phone: 778-821-0621
SKYLAND DR to ECHO RIDGE DR
December 8, 2022 (All day) to December 19, 2022 (All day)
No Disruption
Summer Wood Dr 274 - Fortis repair near Fortis box. Vac truck to Vac near box to find cable behind curb.
Permit number: RUP2022-0889
Project contact: Randy Frasch
ECHO RIDGE DR to NORTH END OF ROAD
December 8, 2022 -
7:30am to 3:30pm
No Disruption
Tallgrass Trail 2080-2220 - correct deficiencies. Pour curb and parking pull outs. Install of approved parking allowance pads as per Sarah Kelly (City). A total of 8 pads. Excavation of surplus material, placement and compaction of sub base, install co
Permit number: RUP2022-0778
Project contact: Kyle Jones
Phone: 250-763-8232
RYEGRASS RD to NORTH END OF ROAD
October 21, 2022 (All day) to December 14, 2022 (All day)
No Disruption
Tower Ranch Dr - sore walls and trusses temporarily across the street from new home construction locations.
Permit number: RUP2022-0777
Project contact: MGN Ventures
MCCURDY RD E to TOWER RANCH DR
October 24, 2022 (All day) to December 31, 2022 (All day)
No Disruption
Tree Maintenance Services & Removal - Various City of Kelowna streets
Permit number: RUP2022-0046
Project contact: Simon Carrol
Phone: 250-870-0954
BARON RD to HWY 97 N
December 12, 2022 -
8:30am to 3:30pm
Single Lane Alternating
Tronson Dr?Crt 904-934 Instll Fortis conduit infront of curb. 1 road crossing at 928 Tronson. Asphalt in roadway will be hard surfaced with 0-Slump concrete temporarily till asphalt plants open in the spring.
Permit number: RUP2022-0877
Project contact: Randy Frasch
TRONSON DR to EAST END OF ROAD
December 5, 2022 - 7:00am to December 22, 2022 - 3:30pm
No Disruption
TRONSON DR to EAST END OF ROAD
December 5, 2022 (All day) to December 22, 2022 (All day)
Truswell Rd (Aqua Project) - install water, sewer, storm for Aqua Tower 1 building.
Permit number: RUP2022-0728
Project contact: Vic Lima
Phone: 250-869-9699
TRUSWELL RD to COOK RD
October 6, 2022 - 7:00am to December 14, 2022 - 7:00pm
Single Lane Alternating
CAPOZZI RD to LAKESHORE RD
October 6, 2022 - 7:00am to December 14, 2022 - 7:00pm
Single Lane Alternating
Various City Streets - paving projects for 2022
Permit number: RUP2022-0310
Project contact: Kim Johnson
BEGBIE RD to JOHN HINDLE DR
September 7, 2022 - 7:00pm to December 31, 2022 - 6:00am
Single Lane Alternating
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2020-0531
Project contact: Slava Korshunov
LAWRENCE AVE to LANE
January 1, 2021 (All day) to December 31, 2022 (All day)
No Disruption
ABBOTT ST to WATER ST
January 1, 2021 (All day) to December 31, 2022 (All day)
No Disruption