Airport Way 5533 - Civil work for installation of Fortis upgrades. Work to include removal and reinstatement of asphalt roadway, concrete sidewalk and curb along with landscape areas as required. Work to be Phased. Separate TMPs for each phase are attache
AIRPORT WAY
From: HWY 97 N...
To: AEROSPACE DR...
Lane Drop - Multi Lane Road



