Arab Rd 150 - etween Sexsmith Rd. and Palamino Rd. Saw cut asphalt and concrete sidewalk/curb/letdown to remove for trenching across Arab Rd. Excavate, install conduits for electrical and communications, sand bed and backfill. Re-instate concrete featur

Home > Roads & Transportation > Roads & sidewalks > Road report > Rup2026 0534 > Arab Rd 150 - etween Sexsmith Rd. and Palamino Rd. Saw cut asphalt and concrete sidewalk/curb/letdown to remove for trenching across Arab Rd. Excavate, install conduits for electrical and communications, sand bed and backfill. Re-instate concrete featur
ARAB RD
From: PALOMINO R...
To: APPALOOSA RD...
Full Road Closure, Local Traffic Only, No Through Traffic, Detour