Road report

Road information is based on issued road usage permits. All public and private contractors are required to obtain a road usage permit for work affecting traffic flow. Click on a coloured line on the map for details about traffic impacts. 

Subscribe to road report e-updates  

Permit number: RUP2023-0983
Project contact: Raquel Dusseault
BERNARD AVE to DOYLE AVE
January 1, 2024 (All day) to July 1, 2024 (All day)
Lane Drop - Multi Lane Road
BERNARD AVE to DOYLE AVE
January 1, 2024 - 7:00am to July 1, 2024 - 4:00pm
Lane Drop - Multi Lane Road
Permit number: RUP2024-0041
Project contact: Craig Donoghue
Phone: 250-487-8102
SOUTH END OF ROAD to WALNUT ST
March 26, 2024 -
6:00am to 12:00pm
Local Traffic Only, No Through Traffic, Detour
Permit number: RUP2024-0136
Project contact: Jay Schlosser
GORDON DR to CERISE DR
March 18, 2024 - 9:00am to March 22, 2024 - 3:00pm
Lane Drop - Multi Lane Road
CERISE DR to CLIFTON RD
March 18, 2024 - 9:00am to March 22, 2024 - 3:00pm
Lane Drop - Multi Lane Road
MILL ST to WATER ST
March 18, 2024 - 7:00am to March 22, 2024 - 1:00pm
Single Lane Alternating
PANDOSY ST to ELLIS ST
March 18, 2024 - 7:00am to March 22, 2024 - 1:00pm
Single Lane Alternating
WATER ST to PANDOSY ST
March 18, 2024 - 7:00am to March 22, 2024 - 1:00pm
Single Lane Alternating
TERRACE HILL PL to EDGEHILL AVE
March 18, 2024 - 9:00am to March 24, 2024 - 3:00pm
Single Lane Alternating
EDGEHILL AVE to SNOWSELL ST
March 18, 2024 - 9:00am to March 24, 2024 - 3:00pm
Single Lane Alternating
LONG RIDGE DR to TERRACE HILL PL
March 18, 2024 - 9:00am to March 24, 2024 - 3:00pm
Single Lane Alternating
UPPER CANYON DR N to LONG RIDGE DR
March 18, 2024 - 9:00am to March 24, 2024 - 3:00pm
Single Lane Alternating
2024 Seasonal Permit - concrete pour. Pump truck will block road access on Dougal Rd on selected days only. Road will be unobstructed on majority of days otherwise. Set up time 6 am but will not start pouring till 7 am
Permit number: RUP2024-0227
SHEPHERD RD to MCINTOSH RD
March 18, 2024 - 6:00am to March 25, 2024 - 7:00am
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
3377 Lakeshore Rd - Lakeshore Rd 3477 & Richter - deliveries, concrete pours etc for this project.
Permit number: RUP2023-0989
Project contact: Taija Jagodnik
SWORDY RD to RICHTER ST
January 1, 2024 - 7:00am to August 31, 2024 - 6:00pm
Lane Drop - Multi Lane Road
Appaloosa Rd 3256 - Utility trailer partially on City road shoulder. No traffic interruptions.
Permit number: RUP2024-0237
Project contact: Liam Gibson
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
Asher Rd 500 - install shallow utilited. Fortis, Telus & Shaw
Permit number: RUP2024-0101
Project contact: Tod Simons
Phone: 250-212-9562
PONTO RD to LEATHEAD RD
February 12, 2024 - 7:00am to April 30, 2024 - 3:30pm
Single Lane Alternating
Band Rd South of 1234 Hume Rd - 150mm air valve replacement on band road. The contractor has rerouted all traffic to hume Ave. We will be working on the closed portion of Band Rd.
Permit number: RUP2024-0213
Project contact: Jeff Clark
Phone: 250-859-5939
WEST END OF ROAD to HUME AVE
March 18, 2024 - 7:00am to March 24, 2024 - 6:00pm
Single Lane Alternating
Belaire 1365 / Chandler St 1840 & 1850 - use of frontage including sidewalk for site office, garage disposal C-can, loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-0056
Project contact: Clayton Unruh
Phone: 778-215-1187
DEVONSHIRE AVE to CHANDLER ST
January 1, 2024 (All day) to May 31, 2024 (All day)
No Disruption
PRIDHAM AVE to BELAIRE AVE
January 1, 2024 (All day) to May 31, 2024 (All day)
No Disruption
Benvoulin Crt 21365/Benvoulin Rd 2175/Mayer Rd - extension of Mayer Rd bet Benvoulin Crt /Rd. Install storm service along new section of Mayer Rd, drywell install in new section of Mayer Rd. Curb, sidewalk install in new section. Relocate crosswalk sign
Permit number: RUP2024-0211
Project contact: Ryan
Phone: 250-718-5922
SOUTH END OF ROAD to SPRINGFIELD RD
March 12, 2024 - 9:00am to May 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
COOPER RD to MAYER RD
March 12, 2024 - 9:00am to May 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
MAYER RD to SPRINGFIELD RD
March 12, 2024 - 9:00am to May 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Bernard Ave 211 - replace glass. Scissor lift infront of Earls. Pedestrian traffic will not be affected. Scissor lift will be on wide sidewalk with 2m clearance for pedestrian and wheelchair access. Signs will be posted.
Permit number: RUP2024-0226
Project contact: Jamie Whittle
Phone: 604-783-0643
ABBOTT ST to MILL ST
March 20, 2024 - 9:00am to March 22, 2024 - 3:00pm
No Disruption
Bernard Ave 560 - Crane take down
Permit number: RUP2024-0146
Project contact: Carmen Derksen
Phone: 250-575-7325
ST PAUL ST to BERTRAM ST
March 18, 2024 - 7:00am to March 22, 2024 - 4:00pm
Full Road Closure, No Through Traffic, Detour
Bertram St (Leon to Harvey Ave ) NB & SB - construction of the north ramp overpass. Works include asphalt, landscaping, concrete removal, deep and shallow foundation work, construction of an ongrade and suspended concrete ramp structure.
Permit number: RUP2024-0141
Project contact: Zane Weal
Phone: 40.3-585-7055
HARVEY AVE to LEON AVE
March 4, 2024 - 7:00am to November 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Birkdale @ Turnberry Rd 1812 (not a road yet) - Sewer tie in on Birdkdale Ave March 25th single lane alternating. March 26th & 27th full closure. Residents to be notified and sent letter. colsure signs to be posted 72 hours in advance. No one lives on
Permit number: RUP2024-0206
Project contact: Felix Menu
Phone: 250-765-0330
WEST END OF ROAD to BIRKDALE AVE
March 25, 2024 -
7:00am to 5:00pm
Single Lane Alternating
WEST END OF ROAD to BIRKDALE AVE
March 26, 2024 - 7:00am to March 27, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
WEST END OF ROAD to BIRKDALE AVE
March 28, 2024 - 7:00am to April 12, 2024 - 5:00pm
Lane Drop - Multi Lane Road
PRESTWICK LANE to TURNBERRY ST
March 25, 2024 -
7:00am to 5:00pm
Single Lane Alternating
PRESTWICK LANE to TURNBERRY ST
March 26, 2024 - 7:00am to March 27, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
PRESTWICK LANE to TURNBERRY ST
March 28, 2024 - 7:00am to April 12, 2024 - 5:00pm
Lane Drop - Multi Lane Road
TURNBERRY ST to PRESTWICK ST
March 25, 2024 -
7:00am to 5:00pm
Single Lane Alternating
TURNBERRY ST to PRESTWICK ST
March 26, 2024 - 7:00am to March 27, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
TURNBERRY ST to PRESTWICK ST
March 28, 2024 - 7:00am to April 12, 2024 - 5:00pm
Lane Drop - Multi Lane Road
Boynton Pl 630 - parking space and sidewalk use for construction in area.
Permit number: RUP2024-0023
Project contact: Thomas Leney
Phone: 236-878-9113
HIGHPOINTE DR to CARAMILLO RD
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Cambridge Ave 549 - construction. Fence on City property
Permit number: RUP2024-0188
Project contact: Travis Erdely
ELLIS ST to KINGSWAY
March 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
Capozzi Rd 3838 / Truswell - Truswell hoarding permit to accommodate our frontage improvements. TMP is in place from previous permits.
Permit number: RUP2024-0012
Project contact: Luca Salis
Phone: 403-703-7192
CAPOZZI RD to COOK RD
January 1, 2024 - 7:00am to June 30, 2024 - 9:00pm
No Disruption
Cara Glen Court 1455 - Debri bins and equipment parked on City road shoulder for construction underway
Permit number: RUP2023-0976
Project contact: Sean Moraes
SOUTH END OF ROAD to CARA GLEN WAY
January 1, 2024 (All day) to June 1, 2024 (All day)
No Disruption
Cara Glen Crt 1430 - Site office trailer parked on City street. Using approx 3 parking stalls. 67 sq meters
Permit number: RUP2024-0028
Project contact: Justin Law
SOUTH END OF ROAD to CARA GLEN WAY
January 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
Caramillo Crt 530/Cara Glen Way/Clifton Rd - install Fortis, Telus, Shaw utilities along Carag Glen Way ROW and road crossing to install utilities at Cara Glen Way and Clifton Rd. Hours on Clifton will only be from 9 to 3:30 pm
Permit number: RUP2024-0209
Project contact: Colin Esau
Phone: 778-214-9640
SPRUCEGLEN DR to EAST END OF ROAD
March 13, 2024 - 7:00am to March 27, 2024 - 5:00pm
Lane Drop - Multi Lane Road
CARAMILLO RD to CARA GLEN WAY
March 13, 2024 - 9:00am to March 27, 2024 - 3:30pm
Lane Drop - Multi Lane Road
CLIFTON RD to EAST END OF ROAD
March 13, 2024 - 7:00am to March 27, 2024 - 5:00pm
Lane Drop - Multi Lane Road
Comment:Abbott St 3061/Cedar Ave - extend construction fencing to the edge of the roadway to allow for a safer work area for site personnel as well as the general public. Ongoing construction of an 87 unit wood frame, 7 story building.
Permit number: RUP2023-0972
Project contact: Gary Klassen/Kanina Wright
Phone: 250-448-8810
MEIKLE AVE to NEWSOM AVE
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
ABBOTT ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
Comment:Osprey Ave 540 - close off the end of the lane to the north of 540 Osprey to house site trailer, Porta Potty. and garbage bin during construction. Adding catch basins.
Permit number: RUP2024-0016
PANDOSY ST to MCKAY AVE
January 1, 2024 (All day) to March 23, 2024 (All day)
Local Traffic Only, No Through Traffic, Detour
Coronation Ave 1036 - use of sidewalk and road shoulder for construction purposes.
Permit number: RUP2024-0057
Project contact: Sarb Hayer
GRAHAM ST to GORDON DR
January 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
GRAHAM ST to GORDON DR
January 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
Coronation Ave 620 - construction of apartment. Fencing on City property.
Permit number: RUP2023-0968
Project contact: Johannes van Leenen
Phone: 250-526-5971
ST PAUL ST to RICHTER ST
January 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
Dayton St Bridge Arch Span @ Hwy 97 - removal of concrete and rebar and installation of new concrete and rebar. Repair
Permit number: RUP2024-0178
Project contact: Jeff Caldwell
SUTHERLAND AVE to KIRSCHNER RD
February 27, 2024 - 7:00am to March 27, 2024 - 5:00pm
Lane Drop - Multi Lane Road
Devonshire Ave 1274 - Deliveries and any traffic interruptions.
Permit number: RUP2024-0026
Project contact: Marlon Kotter
Phone: 250-300-5093
PRIDHAM AVE to BELAIRE AVE
January 1, 2024 (All day) to August 31, 2024 (All day)
Lane Drop - Multi Lane Road
Dougal Rd N 540 (lane) - Closure of back lane. 400 square meters
Permit number: RUP2024-0234
Project contact: Rick Horn
Phone: 778-533-1221
MCINTOSH RD to LEATHEAD RD
March 15, 2024 (All day) to April 15, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Dougall Rd N 540 - staging area to facilitate construction of 124 unit residential rental building. Site Trailer
Permit number: RUP2024-0047
Project contact: Zach Ireland
Phone: 226-979-5075
MCINTOSH RD to LEATHEAD RD
December 24, 2023 (All day) to April 30, 2024 (All day)
No Disruption
Doyle Ave 550 / St Paul St- Jersey barrier set up along alley, Doyle Ave and St Paul for public safety from construction traffic and future excavation
Permit number: RUP2023-0973
Project contact: Lauren Cooper
ST PAUL ST to BERTRAM ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Emergency Water Service Leak Repair - Birch Ave 856
Permit number: RUP2024-0230
Project contact: Jens Petersen
Phone: 250-469-8424
ABERDEEN ST to ETHEL ST
March 15, 2024 - 7:00am to March 21, 2024 - 3:00pm
No Disruption
Emergency Water Service Leak Repair - Morrison Ave 465
Permit number: RUP2024-0222
Project contact: Jens Petersen
Phone: 250-469-8424
ABBOTT ST to PANDOSY ST
March 14, 2024 - 7:00am to March 20, 2024 - 3:00pm
No Disruption
Enterprise Way ( Cooper to Dilwroth Dr) - Charity Event Detour thru Hwy 97 (Harvey). Fees waived for Charity Event
Permit number: RUP2024-0084
Project contact: Maxine Dehart United Way Breakfast
Phone: 250-862-7662
COOPER RD to DILWORTH DR
October 17, 2024 -
5:00am to 9:00am
Local Traffic Only, No Through Traffic, Detour
Ethel St 1916 - tie in Fortis & Telus lines to existing ducts. Install Fortis just outside of property line and inside right of way. May infringe on asphalt slightly. Right side of property will tie in Telus outside of property line and infringe on sid
Permit number: RUP2024-0221
Project contact: Dan Podmorow
Phone: 778-215-1649
BURNE AVE to SUTHERLAND AVE
March 13, 2024 - 8:00am to March 20, 2024 - 4:00pm
Lane Drop - Multi Lane Road
Forits Weekly Service Installs - various City streets
Permit number: RUP2024-0232
Project contact: Thomas Abenante
Phone: 250-868-4518
KEL MAC CT to MATRIX CR
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
ETHEL ST to GRAHAM ST
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
HOUGHTON RD to LEATHEAD RD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
LOCHNESS ST to NORTH END OF ROAD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
HILLTOWN DR to EAST END OF ROAD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
TRESTLE RIDGE CT to UPPER MISSION DR
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
WEST END OF ROAD to CASSIAR RD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
CROSS RD to ROJEM RD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
QUAIL RIDGE BLVD to PIER MAC WAY
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
ROSE AVE to ROYAL AVE
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
WEST END OF ROAD to MISSION RIDGE DR
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
LACOMBE RD to MORRISON RD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
ETHEL ST to BOWES ST
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
LAKE AVE to RIVERSIDE AVE
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to GARNER RD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
RUSSO ST to NORTH END OF ROAD
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
KANE RD to GLEN PARK DR
March 18, 2024 - 9:00am to March 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Fortis Seasonal Permit - all overhead works. No excavation work only. Various City Streets
Permit number: RUP2024-0005
Project contact: Dustin Bates
Phone: 250-717-0828
SPALL RD to HARDY ST
January 23, 2024 - 9:00am to March 23, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Glenmore Dr south of the landfill NB Vehicle recovery from ditch
Permit number: RUP2024-0238
Project contact: Ashley Steiger
BEGBIE RD to JOHN HINDLE DR
March 19, 2024 -
10:00am to 12:00pm
Single Lane Alternating
Hazell Rd 4305 - upgrade city fire main, tie-in sewer & water to provide future housing in newly subdivided lot facing Young Rd. Install concrete burb and sidewalk.
Permit number: RUP2024-0224
Project contact: Tristen Taylor
Phone: 250-863-5131
TORRS RD to YOUNG RD
March 18, 2024 - 7:00am to April 8, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour, Single Lane Alternating
Innovation Dr 1665 - 80 ft articulating boom lift window cleaning at the Hamton Hotel. Using single lane alternating traffic and 2 traffic control persons and a service vehicle with hazards and cone as well as using stop and do signs to guide traffic saf
Permit number: RUP2024-0117
Project contact: Reeve
FLEET AVE to AIRPORT WAY
April 18, 2024 -
9:30am to 3:30am
Single Lane Alternating
Install New Above Ground PRV Station, Hydrant & Air Valve - McClain Rd 4198 / June Springs Rd
Permit number: RUP2024-0195
Project contact: Jens Petersen
Phone: 250-469-8424
MCCLAIN RD to TATLOW RD
March 11, 2024 - 7:00am to March 28, 2024 - 3:00pm
Single Lane Alternating
JUNE SPRINGS RD to JEAN RD
March 11, 2024 - 7:00am to March 28, 2024 - 3:00pm
Single Lane Alternating
MCCLAIN RD to JUNE SPRINGS RD
March 11, 2024 - 7:00am to March 28, 2024 - 3:00pm
Single Lane Alternating
Jim Bailey Cres @ 235 Potterton Rd - sanitary tie-in to existing manhole.
Permit number: RUP2024-0196
Project contact: Rob Desjardins
Phone: 250-826-8876
BUBNA RD to JIM BAILEY RD
March 11, 2024 - 7:00am to April 12, 2024 - 5:00pm
Lane Drop - Multi Lane Road
KLO/Richter St SW Corner - repair sidewalk damaged during construction. Absolutely no disruption to traffic.
Permit number: RUP2024-0235
Project contact: John Milligan
RICHTER ST to CONLIN CT
March 19, 2024 - 7:00am to March 21, 2024 - 5:00pm
No Disruption
Lakeshore Rd 3101 & KLO - Pouring sidewalk & letdowns, therefore, require a lane push. Jeff advised no excavation required. Just pouring concrete.
Permit number: RUP2024-0205
Project contact: Jeffrey Simons
Phone: 7778-760-0650
LANFRANCO RD to CEDAR AVE
March 20, 2024 -
12:00pm to 3:30pm
Lane Drop - Multi Lane Road
CEDAR AVE to TUTT ST
March 20, 2024 -
12:00pm to 3:30pm
Lane Drop - Multi Lane Road
Lakeshore Rd 3101/KLO Rd - Lakeshore Rd 3101/KLO Rd - sidewalk adjacent to KLO will be closed and pedestrian traffic diverted at the crosswalk. Along Lakeshore the curb lane will be closed and temporary sidewalk created as discussed with COK staff. Clos
Permit number: RUP2024-0093
Project contact: Jeromy Jobke
Phone: 250-809-0662
LANFRANCO RD to CEDAR AVE
February 1, 2024 - 9:00am to May 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
CEDAR AVE to TUTT ST
February 1, 2024 - 9:00am to May 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Lakeshore Rd 3340 - install underground power service. All previous work completed and restored. Only working on Swordy for now. Will advise when they move on.
Permit number: RUP2024-0035
Project contact: Rob Reitman
Phone: 250-862-6720
LAKESHORE RD to LANDIE RD
January 8, 2024 - 7:00am to April 4, 2024 - 5:30pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to WALNUT ST
March 18, 2024 - 7:00am to March 19, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Lakeshore Rd 3340 / Watt - temporary staging area, excavations and safety buffer. Temporary delineators and construction fencing will be provided to separate public from construction activities.
Permit number: RUP2024-0194
Project contact: Marc Redka
Phone: 250-870-2825
SOUTH END OF ROAD to WALNUT ST
March 1, 2024 (All day) to March 31, 2024 (All day)
No Disruption
Lawrence Ave 1131 (Formerly 1605 Gordon Dr) - build 6 story building. Facilitate material drop off without distrubance to traffic on Gordon Dr, the contractor wishes to use the lane currently used for a bus stop and public parking. They will separate th
Permit number: RUP2023-0971
Project contact: Ryan Seddon
Phone: 250-808-4079
GORDON DR to CENTENNIAL CR
January 1, 2024 - 7:00am to October 31, 2024 - 7:00pm
Lane Drop - Multi Lane Road
GORDON DR to CENTENNIAL CR
January 1, 2024 - 7:00am to October 31, 2024 - 7:00pm
Lane Drop - Multi Lane Road
Leon Ave 278 - deliveries to site, off loading and loading, personnel entering or exiting
Permit number: RUP2023-0015
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 5, 2023 (All day) to May 5, 2024 (All day)
Lane Drop - Multi Lane Road, Continually Moving Work, No Disruption
Leon Ave 278 - off loading and pumping concrete. Deliveries to site. Personnel entering or exiting site. Intermittent.
Permit number: RUP2023-0969
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leon Ave 278 Hoarding Permit Issued - to show permit in place. However, fees will be waived due to Amega being charged by the Parking Dept for parking stalls all along Leon Ave. Fees will be collected for parking spaces which will include the Hoarding.
Permit number: RUP2023-0970
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Leon Ave 278/Water St/Laneway - Supply install waterline & connections, sanitary line, manholes, tie-ins, storm line, manholes and catch basins. There is also some removals of old infrastruycture.
Permit number: RUP2024-0147
Project contact: Dave Hrabchuk
Phone: 250-306-7128
ABBOTT ST to WATER ST
March 17, 2024 (All day) to March 20, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Longhill Rd 2389 - install gas main up the NE sode of Longhill Rd in the gravel boulevard. Install gas servie across Longhill to 2389 Longhill Rd.
Permit number: RUP2024-0220
Project contact: Steve Bicknell
Phone: 250-868-4518
CROSS RD to ROJEM RD
March 18, 2024 - 7:00am to April 30, 2024 - 5:00pm
Single Lane Alternating
Lower Crt 2984 - repair conduit. All work is off the roadway and there will be no lanes closed or traffic impacted
Permit number: RUP2024-0207
Project contact: Hailey Schmidt
KLO RD to NORTH END OF ROAD
March 27, 2024 - 8:00am to March 28, 2024 - 4:00pm
No Disruption
McKay Ave (Osprey to before parking lot entrance) - shut down a portion of McKay Avenue so we can finish up the glazing with lifts. I have attached a site plan showing the areas in question. Thanks,
Permit number: RUP2024-0182
Project contact: Vic Worman
PANDOSY ST to OSPREY AVE
March 1, 2024 (All day) to March 29, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Moss Crt - Set up trailer and laydown yard on Moss Crt adjacent to site.
Permit number: RUP2023-0975
Project contact: Andreas Hayer
SOUTH END OF ROAD to EVERGREEN CT
January 1, 2024 (All day) to June 30, 2024 (All day)
No Disruption
Mountain Ave 1856 EB laneway -Polar Communications will be placing new conduit from the vault to the customers home underground and will be cutting the road beside the vault.
Permit number: RUP2024-0138
Project contact: Hailey Schmidt
LANE to GLENMORE DR
March 27, 2024 - 8:00am to March 28, 2024 - 4:00pm
Single Lane Alternating
Osprey Ave -to use the street parking and sidewalk for hoarding on the Osprey Avenue side (as we are now opening up Osprey Avenue for the general public but would still like the parking and sidewalk shut down for hoarding). So just changing the amount of
Permit number: RUP2024-0181
Project contact: Vic Vachon
PANDOSY ST to MCKAY AVE
March 1, 2024 (All day) to March 23, 2024 (All day)
No Disruption
Pandosy/Francis (lanes south of Francis/Morrison/Patterson) - sanitary sewer replacement, asphalt removal, excavation, prep and trenching. Full depth road construction and paving.
Permit number: RUP2024-0225
Project contact: Brett Allinghame
Phone: 250-258-4600
WARDLAW AVE to PATTERSON AVE
March 15, 2024 (All day) to June 1, 2024 (All day)
PATTERSON AVE to MORRISON AVE
March 15, 2024 (All day) to June 1, 2024 (All day)
MORRISON AVE to FRANCIS AVE
April 18, 2024 - 9:00am to May 14, 2024 - 3:30pm
Lane Drop - Multi Lane Road
MORRISON AVE to FRANCIS AVE
March 15, 2024 (All day) to June 1, 2024 (All day)
PANDOSY ST to RICHTER ST
April 3, 2024 - 7:00am to April 23, 2024 - 7:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
PANDOSY ST to RICHTER ST
March 15, 2024 (All day) to June 1, 2024 (All day)
FRANCIS AVE to BIRCH AVE
March 15, 2024 (All day) to June 1, 2024 (All day)
PANDOSY ST to RICHTER ST
March 15, 2024 (All day) to June 1, 2024 (All day)
PANDOSY ST to RICHTER ST
March 18, 2024 (All day) to April 18, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
PANDOSY ST to RICHTER ST
March 15, 2024 (All day) to June 1, 2024 (All day)
PANDOSY ST to RICHTER ST
April 12, 2024 - 7:00am to May 8, 2024 - 7:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
PANDOSY ST to RICHTER ST
March 15, 2024 (All day) to June 1, 2024 (All day)
FRANCIS AVE to BIRCH AVE
March 18, 2024 - 7:00am to April 11, 2024 - 7:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
FRANCIS AVE to BIRCH AVE
March 15, 2024 (All day) to June 1, 2024 (All day)
PANDOSY ST to RICHTER ST
March 15, 2024 (All day) to June 1, 2024 (All day)
PANDOSY ST to RICHTER ST
March 18, 2024 - 7:00am to April 11, 2024 - 7:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Pier Mac Way 2050 - West Boulevard, SB bike lane Install Fortis BC shallow utility conduit in west boulevard along Pier Mac Way. Project work zone is in the west boulevard of Pier Mac Way between Airport Way and Lochren Rd. The works under this permit
Permit number: RUP2024-0109
Project contact: Simon Benson
KEL MAC CT to MATRIX CR
February 5, 2024 - 7:00am to March 31, 2024 - 5:00pm
No Disruption
PIER MAC WAY to PIER MAC WAY
March 25, 2024 - 7:00am to March 27, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
KEL MAC CT to MATRIX CR
March 25, 2024 - 7:00am to March 27, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
MATRIX CR to LOCHREM RD
March 25, 2024 - 7:00am to March 27, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
MATRIX CR to MATRIX CR
March 25, 2024 - 7:00am to March 27, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Raymer Ave 750 - loading and unloading delivery trucks once a week. Temporary closure of pedestrians walkway when the site has deliveries with traffic control
Permit number: RUP2024-0063
Project contact: Manny Mehrok
RICHTER ST to CURTS ST
January 16, 2024 (All day) to May 15, 2024 (All day)
Lane Drop - Multi Lane Road
Richter St 1710 & 1720 (bet Harvey Ave & Saucier) South of Hwy 97 - Install Fortis & Shaw conduit along westside of road.
Permit number: RUP2024-0233
Project contact: Rob Reitman
Phone: 250-862-6720
SAUCIER AVE to HARVEY AVE
March 19, 2024 - 9:00am to March 29, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Royal Ave & Long St - laydown and trailer site/seacan placement.
Permit number: RUP2023-0990
Project contact: Brady Allen
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Rutland Rd N 169 - one lane and sidewalk closure for material laydown and deliveries/hoisting. A pedestrian provision has been accounted for. Total of 165 sqm of workk zone.
Permit number: RUP2024-0180
Phone: 403-367-1330
HWY 33 W to SHEPHERD RD
March 1, 2024 (All day) to March 31, 2024 (All day)
Lane Drop - Multi Lane Road
Rutland Sewer Project Continuation - Phase 4 to Phase 8
Permit number: RUP2024-0094
Project contact: Rob Reitman
Phone: 250-862-6720
VALLEYVIEW RD to DOUGALL RD S
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
DOUGALL RD S to ROBSON RD W
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
JUROME RD to GRAY RD
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
DOUGALL RD S to CAMBIE RD
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
CAMBIE RD to PEMBERTON RD
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
JUROME RD to GRAY RD
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
ROBSON RD W to RUTLAND RD S
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
PEMBERTON RD to ROBSON RD W
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
JUROME RD to ROBSON RD E
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
JUROME RD to GRAY RD
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
HOLBROOK RD W to JUROME RD
February 1, 2024 - 7:00am to April 30, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Saucier Ave 812 - closure of sidewalk, shoulder and single westbound lane of Saucier Ave. Site hoarding will be for approx 2 years.
Permit number: RUP2023-0987
Project contact: Brodie Scott
RICHTER ST to ETHEL ST
January 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
Single Lane Alternating
Springfield Rd 1905 - crane work require curbside lane closure. Roofing building
Permit number: RUP2024-0201
Project contact: Roy Olsen
Phone: 250-864-1511
SPALL RD to BREDIN RD
March 13, 2024 - 9:30am to April 13, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Springfield Rd 2622 - pole access for cable work. All overhead work. No excavation.
Permit number: RUP2024-0236
Project contact: Marley Futerko
Phone: 604-444-3799
GRAHAM RD to GERSTMAR RD
March 28, 2024 - 9:00am to March 29, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Sutherland ATC Project 1 & 2 - road and utilities construction, removals, underground utilities, gravels, curb, siidewalks, electrical and landscaping.
Permit number: RUP2024-0165
Project contact: Garrett Rutten
Phone: 250-859-1409
LINDAHL ST to CHANDLER ST
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
ETHEL ST to CARRUTHERS ST
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
BOWES ST to LEQUIME ST
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
CARRUTHERS ST to BOWES ST
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
LEQUIME ST to GORDON DR
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
GORDON DR to CAPRI ST
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
CAPRI ST to PACIFIC CT
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
PACIFIC CT to LINDAHL ST
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
CHANDLER ST to BURTCH RD
February 28, 2024 - 7:00am to June 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
This is part of Permit # 2023-0974 Springfield RD @ Ambrosi Rd 1946 - Off loading prefabricated walls and framing material and construction fence on City sidewalk. Less than a foot onto the sidewalk and 1.2 m will be maintained at all times. Trip feet wi
Permit number: RUP2024-0004
Project contact: Andreas Hayer
SPRINGFIELD RD to AGASSIZ RD
January 1, 2024 (All day) to June 30, 2024 (All day)
Lane Drop - Multi Lane Road
AMBROSI RD to BARLEE RD
January 1, 2024 (All day) to June 30, 2024 (All day)
Lane Drop - Multi Lane Road
Tilley Rd 232 - Sanitary Sewer Main and Services from intersection at Jim Bailey Rd to the East Property line of 232 tilly Rd
Permit number: RUP2024-0229
Project contact: Jim Tobin
Phone: 250-470-3561
JIM BAILEY RD to HALDANE RD
March 18, 2024 - 7:00am to June 30, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Tree Mtce _ Removal - Various City streets. No excavation.
Permit number: RUP2024-0007
Phone: 250-862-0734
LANE to RICHTER ST
March 22, 2024 -
8:00am to 3:00pm
No Disruption
CADDER AVE to BURNE AVE
March 22, 2024 -
8:00am to 3:00pm
No Disruption
Truswell Rd 550 - lift chiller to top of roof on Tower 1 Aqua Latitude project.
Permit number: RUP2024-0197
Project contact: Luca Salis
Phone: 403-703-7192
CAPOZZI RD to COOK RD
March 20, 2024 -
7:00am to 5:00pm
Single Lane Alternating
Tutt St 3022 - remove and replace sidewalk and letdown
Permit number: RUP2024-0198
Project contact: Brandon Westgate
Phone: 250-212-2154
KLO RD to GROVES AVE
March 11, 2024 - 7:00am to March 19, 2024 - 3:00pm
No Disruption
Upper Canyon Dr N 287 - big steel box on City road shoulder. Moving
Permit number: RUP2024-0228
RED ROCK CT to FOREST EDGE DR
March 21, 2024 (All day) to March 27, 2024 (All day)
No Disruption
Walburn Rd 2455 NB- install 211m of 60mm PE main
Permit number: RUP2024-0208
Project contact: Steve Bicknell
Phone: 250-868-4518
SOUTH END OF ROAD to GARNER RD
March 18, 2024 - 7:00am to March 29, 2024 - 5:00pm
Single Lane Alternating
SOUTH END OF ROAD to GARNER RD
March 18, 2024 (All day) to March 29, 2024 (All day)
Walker Rd 4567 - work for Shaw Cable, in order to use existing conduit, we will need to dig down and repair conduit blockage beside the Shaw vault across the street from the customers home. The vault is bet 448 Cascia Dr and 4582 Walker Rd. All work is
Permit number: RUP2024-0212
Project contact: Hailey Schmidt
CASCIA DR to CARONA CR
March 21, 2024 - 8:00am to March 22, 2024 - 4:00pm
No Disruption
Wardlaw Ave 602 - unloading and unloading materials. Intermittent Ongoing thru the end of the year to manage deliveries only
Permit number: RUP2024-0019
Project contact: Lance Beaudoin
PANDOSY ST to RICHTER ST
January 1, 2024 - 8:00am to October 31, 2024 - 6:00pm
Single Lane Alternating
Wardlaw Ave 640 - use of front street parking and sidewalk for site office, garbage disposal, storage trailers and loading and unload of trucks. Site will be fully fenced.
Permit number: RUP2023-0964
Project contact: Kimberly Rose
PANDOSY ST to RICHTER ST
January 1, 2024 (All day) to April 30, 2024 (All day)
Single Lane Alternating
Wardlaw Ave 727 / Richter St 2609-2611 - install Fortis conduit. Concrete till asphalt plant opens.
Permit number: RUP2024-0086
Project contact: Sheilan Laing
Phone: 604-845-6113
KINNEAR AVE to WARDLAW AVE
January 29, 2024 - 9:00am to March 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
KINNEAR AVE to WARDLAW AVE
January 29, 2024 - 9:00am to March 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
KINNEAR AVE to WARDLAW AVE
January 29, 2024 - 9:00am to March 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
RICHTER ST to CURTS ST
January 29, 2024 - 7:00am to March 31, 2024 - 5:00pm
Single Lane Alternating
Wardlaw Rd 727 & Lane - Install water and storm systems, curb and sidewalk.
Permit number: RUP2024-0217
Project contact: Randy Smith
Phone: 250-300-0313
RICHTER ST to CURTS ST
March 18, 2024 - 7:00am to April 10, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
KINNEAR AVE to WARDLAW AVE
March 18, 2024 - 7:00am to April 10, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2024-0068
Project contact: Slava Korshunov
LAWRENCE AVE to LANE
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Water St 1659 / Leon Ave - errect scafolding to close portion of walkway at the corner to work on building.
Permit number: RUP2024-0008
Project contact: Thomas Scheffer
Phone: 778-214-7214
WATER ST to PANDOSY ST
February 5, 2024 - 7:00am to May 23, 2024 - 4:00pm
No Disruption
Weddell/Richter Ethel Traffic Control Training - 2024
Permit number: RUP2023-0984
Project contact: Alex Johnson
RICHTER ST to ETHEL ST
March 24, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to CROWLEY AVE
March 24, 2024 -
8:00am to 4:00pm
Single Lane Alternating
ETHEL ST to GORDON DR
March 24, 2024 -
8:00am to 4:00pm
Single Lane Alternating
CROWLEY AVE to ETHEL ST
March 24, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to ETHEL ST
March 24, 2024 -
8:00am to 4:00pm
Single Lane Alternating
BAILLIE AVE to RECREATION AVE
March 24, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RECREATION AVE to WEDDELL PL
March 24, 2024 -
8:00am to 4:00pm
Single Lane Alternating
ETHEL ST to GORDON DR
March 28, 2024 -
8:00am to 4:00pm
Single Lane Alternating
CROWLEY AVE to ETHEL ST
March 28, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to ETHEL ST
March 28, 2024 -
8:00am to 4:00pm
Single Lane Alternating
BAILLIE AVE to RECREATION AVE
March 28, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RECREATION AVE to WEDDELL PL
March 28, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to CROWLEY AVE
March 28, 2024 -
8:00am to 4:00pm
Single Lane Alternating