Bluebird Storm Station Improvements

The current station has limited pump capacity and the existing structure prevents the upgrade to a larger pump and associated piping. This project is to upgrade the station which would increase the size of the structure to allow for a larger pump and the provision for additional pump should conditions require it. In addition an increase to a variable speed drive would allow for greater flexibility in dewatering activities to preserve the storm water collection system in the area.