5298 Upper Mission Dr - installing 39.0 of 26mm PE service from location fronting 5152 Chute Lake Road which will cross the entire road allowance width to 5298 Upper Mission Dr. Need to keep at least one lane open during construction.

Home > Roads & Transportation > Roads & sidewalks > Road report > Rup2024 0332 > 5298 Upper Mission Dr - installing 39.0 of 26mm PE service from location fronting 5152 Chute Lake Road which will cross the entire road allowance width to 5298 Upper Mission Dr. Need to keep at least one lane open during construction.
UPPER MISSION DR
From: TRUMPETER...
To: CHUTE LAKE RD...
Lane Drop - Multi Lane Road, Continually Moving Work, Single Lane Alternating