Pavement Management Programpaving.png

The Pavement Management Program prioritizes and determines how to upgrade and repair the roads surface.
 
Road priorities are based on various tests and software analysis that provide a numerical ranking for each road. In certain cases a core sample helps to identify the quality of the road base and determines the type of treatment required.


Upcoming Pavement Management Projects

The following is a list of the 2016 Pavement Management projects with anticipated road work dates. Please note dates are weather dependent and subject to change.

Road Segment 2016 Project Dates
Springfield Road (Dilworth Road to Ziprick Road) May 
Pandosy Street (KLO Road to Cadder Avenue) June
Cooper Road (Highway 97 to Enterprise Way) Mid-July (night work)
Dilworth Drive (Highway 97 to Enterprise Way) Mid-July (night work)
Leckie Road (Highway 97 to Enterprise Way) Mid-July (night work)
Highway 33 (Highway 97 to Enterprise Way) Mid-July (night work)
Enterprise Way (Banks Road to Highway 97) Mid-July (night work)
Dilworth Drive (Bridge to Summit Drive) Mid-August
Lakeshore Road (Cook Road to North of Barrera Road)   September
KLO Road (Richter Street to Pandosy Avenue) September

 

Road Treatments

There are a variety of road treatment options including:

Mill and Fill

The Mill and Fill Program extends the life of existing roadways by twenty years and creates a smooth ride by eliminating the effects of tire ruts and asphalt movement that occur over years of use.  

This is accomplished by removing approximately 20 mm of existing asphalt through a process called cold milling, then replacing it with a suitable depth of new hot mix asphalt. The 20 mm of milled asphalt that is removed is recycled and used as a surface treatment on rural roads and lane ways throughout the city. 

Asphalt Overlay  

The Asphalt Overlay Program involves the application of two inches of new asphalt on top of the existing roadway, creating a new driving surface and extending the life of the road. This process is typically performed on rural streets with no curbs and gutters. 

Micro-Surfacing  

Micro Surfacing preserves and extends the life of the road surface by sealing, filling ruts and providing skid resistance. Micro Surfacing involves the application of a dense graded aggregate, mixed with asphalt emulsions, water and mineral fillers, to the road surface. Once applied it takes approximately four to five hours to cure creating a new stable surface that is resistant to rutting in the summer and cracking in the winter. 

Road Reclaiming 

Road Reclamation creates a new road by grinding the roadway’s existing asphalt and gravel base, then mixing it with new gravel. This mixture is placed on the roadbed, graded and shaped prior to receiving two inches of new asphalt.  

Road Reclamation is typically performed on rural streets with no curbs and gutters.  

Hot Mix Patching 

From April until November hot mix asphalt is purchased and used for asphalt repairs on all city roads. During the winter months when hot mix asphalt is unavailable, old asphalt that has been collected during the summer is recycled and used for asphalt repairs.

CRF

CRF is an asphalt rejuvenator that treats the surface and extends the asphalt life. The rejuvenating agent is placed on the asphalt and then a fine layer of sand is worked into the surface. The sand remains on the roads for a few weeks before it is swept away. This process leaves a surface that is more resistant to wear over the years.

For more information, call 250 469-8600 or Report a Problem by filling out an online service request.